Pile Test Systems was the first company in the world to conduct a successful field experiment to test a full-scale two-section bored pile for vertical downward load capacity using the proposed ONLY-DOWN method (as compared to the world-wide Osterberg method) at the construction site at 21A Studentska Street in Kharkiv